Engineering Reference & ASME Code Basis

1. Core Formula & Variable Definitions

NFPA 69 — Standard on Explosion Prevention Systems (Purging and Inerting, Chapter 7) · API Recommended Practice 2016 — Entering and Cleaning Petroleum Storage Tanks · CGA G-8.1 — Standard for Nitrogen and Inert Gas Purging Procedures · ASME B36.10/19 — Pipe inside diameter for piping geometry

Dilution: VN2 = Vsys · ln((C0Cin)/(CtCin)) / K  ·  t = VN2 / Q

Pressure-cycle: Cn = C0 (Plow/Phigh)n  ·  VN2 = n · Vsys · (Phigh,g/Pstd)

NFPA 69 Chapter 7 · API RP 2016 · CGA G-8.1 screening

Default K 0.75Target O₂ 5%Margin +20% N₂Cylinder 50 L @ 200 bar ≈ 10 Nm³

Piping V_sys uses ASME B36 Sch 40 inside diameter. Vessel V_sys = π r² (L + 0.5·Di) for cylinder + 2:1 SE head equivalent. Dilution applies mixing efficiency K. Pressure-cycle n = ceil(ln(Ct/C0)/ln(Plow/Phigh)) with absolute pressures; N₂ inventory uses gauge ΔP to atmosphere over P_std (1.0 bar / 14.7 psi). +20% procurement margin on gas supply rows. Screening only — continuous O₂ monitoring required.

  • V_sys (System Internal Volume)Piping, vessel, or custom free volume (m³ / ft³).
  • C0 / Ct (Initial / Target O₂)Starting and maximum residual oxygen concentration (%).
  • K (Mixing Efficiency)Sweep mixing factor 0.25–1.0 (NFPA 69 screening).
  • Q (Purge Flow)Nitrogen flow for dilution timing (Nm³/h / SCFM).
  • n (Cycle Count)Pressure or vacuum cycles to reach Ct from C0.
  • V_N2 (Required Nitrogen)Theoretical purge gas inventory (Nm³ / SCF).

2. Allowances, Tolerances & Standards

Theoretical gas demand only. Continuous O₂ monitoring and MAWP compliance are mandatory field controls.

Personnel / process safetyO₂ analyzer at vent

Do not introduce hydrocarbons or enter confined spaces until measured O₂ ≤ target (NFPA 69 / API RP 2016).

Pressure-cycle MAWPP_high < MAWP

Never exceed vessel/piping MAWP. Provide relief protection before pressurizing.

Procurement margin+20% N₂

Supply rows apply a 20% contingency on theoretical V_N2 for cylinder / trailer / LN₂ screening.

Quick Reference Lookup Table

Nitrogen purging volume screening — engine-computed V_sys, V_N2, time / cycles
CaseGeometryMethodV_sysV_N2Time / n
Default metricNPS 12 · 100 mDilution7.22 m³13.82 Nm³16.6 min
Vessel metricDi 2000 · L 6000Pressure cycle21.99 m³131.9 Nm³n = 2
Piping imperialNPS 24 · 500 ftDilution1396 ft³5666 SCF56.7 min
Custom imperial1000 ft³Pressure cycle1000 ft³6122 SCFn = 2
NPS 6 · 50 mPipingDilution · Ct 8%0.93 m³1.20 Nm³2.9 min
Custom 50 m³CustomDilution · Ct 2%50 m³147.0 Nm³110 min

Rows from the FEK nitrogen-purging-volume solver (B36 Sch 40 ID; vessel L + 0.5·Di). Spec ≈22.1 m³ / 132.6 Nm³ cases round to engine 21.99 m³ / 131.9 Nm³. Not a certified NFPA 69 procedure — confirm O₂ analyzers and MAWP.

3. Material & Code Limitations

Ideal-gas inventory estimates for field logistics — confirm supplier fill pressure and trailer capacity.

Material GroupTemperature RangeAllowable Stress / LimitEngineering Notes
50 L cylinder @ 200 bar≈ 10 Nm³Water volume × fill pressure / P_std screening.
Tube trailer≈ 2000 Nm³Generic high-pressure trailer inventory for equivalent count.
Liquid nitrogen≈ 0.682 Nm³ / L LN₂Expansion ≈ 682:1 at ambient screening conditions.

4. Step-by-Step Worked Example

Field VerificationShow

Worked Example — NPS 12 · 100 m Dilution Sweep · 21% → 5% O₂

Default metric piping duty: NPS 12 Sch 40, L = 100 m, K = 0.75, Q = 50 Nm³/h.

Geometry:NPS 12 Sch 40 · L = 100 mO₂:C0 = 21% · Ct = 5% · Cin = 0%K / Q:K = 0.75 · Q = 50 Nm³/h
1

Compute system volume

B36 Sch 40 ID ≈ 303.23 mm → V_sys = π r² L ≈ 7.22 m³.
Result:V_sys ≈ 7.22 m³
2

Dilution nitrogen demand

7.22 · ln(21/5) / 0.75 ≈ 13.82 Nm³.
Result:V_N2 ≈ 13.82 Nm³
3

Purge duration

13.82 / 50 h ≈ 16.6 min.
Result:t ≈ 16.6 min
4

Procurement margin

Apply +20% → ≈ 16.6 Nm³ ≈ 2 × 50 L / 200 bar cylinders (screening).
Result:+20% supply ≈ 16.6 Nm³
Conclusion: Default dilution duty screens at ≈13.82 Nm³ N₂ and ≈16.6 min at 50 Nm³/h — verify with continuous O₂ monitoring.